Alex Coomber
A Class 319 No. 319012 25KV/750 Volt DC Third Rail built in 2 matches at York for the New Cross London Thameslink service from Bedford to Brighton. The Class 319s remained on this corridor until the introduction of new trains in 2015 at which point some were deployed for use elsewhere. No. 319012 sports the new Network Southeast livery as it pauses at London Kings Cross Thameslink on a Northbound Service in June 1988.