Tiddlyharn East Model Railway
A big day today at Tiddlyharn East as the Main Control Panel Shelf slots into place! There are still wire holes to drill in the base of the shelf which is why the bolts are not yet properly tightened (to allow me to remove the shelf again easily) but when complete this allows wiring work to begin as soon as possible!